Review Of Mining Operations Plan Nsw Ideas

On 9 September 2013, The Department Released Esg3:


Lodged with the nsw division of resources and energy (dre) in january 2017. Proposed mining activities describe the operations and the methods to be used for any of the following activities which are proposed during the mop period. Mining operations plan (mop) guidelines, september 2013 (esg3) which details a new

About Authorisations In New South Wales, Contact:


Clarence colliery is a wholly owned subsidiary of centennial coal company limited (which is • consideration of issues of public safety in the design of final landforms. Nsw proposing to get rid of mining operations plans by claire smith, lauren smith and cloe jolly the nsw government has released amendments to the mining regulation 2016 intended to provide greater clarity around mining lease conditions to achieve rehabilitation outcomes.

Nsw Government Introduces New Mining Rehabilitation Rules.


Of resources and energy (dre) for the suspension of mining operations at the invincible colliery on 16th january 2013 under section 70(1)(a) of the mining act 1992 nsw (mining act). A mop fulfils the function of both a rehabilitation plan and a mine closure plan. The contents of this mining operations plan (mop) follow the format identified in the nsw department of trade and investment (now known as resources regulator) publication entitled “ esg3 mining operations plan (mop) guidelines ”, september 2013.

I&I Nsw New South Wales Department Of Industry And Investment (Now Nsw T&I) Imrp Ginkgo Integrated Mining Rehabilitation Plan Lmp Land Management Plan Lpma Nsw Lands Property Management Authority (Abolished April 2011) Mop Mining Operations Plan Mla Mining Lease Area Mremp Mining Rehabilitation And Environmental Management Plan


Mine closure plan page 7 of 29 23/07/2009 figure 1 regional location of drayton mine 4.6.3 statutory requirements the department of planning nsw is the consent authority for this development. (november 2020) and may not be accurate, current or complete. The location of mt arthur coal is shown in plan 1.

Revised Draft Mining Operations Plan (Mop):


The objective of this mining operations plan (mop) is to allow continued mining operations at mt arthur coal, following the changes to the development consent associated with the granting of approval for the Under mining lease and class d puddling claim conditions, the applicant/claim holder is required to develop a mining operations plan (mop) to the satisfaction of the department of regional nsw (the department). Mining activities are tightly controlled in nsw, with a range of authorisations required prior to the commencement of operations.